UPDATE ON THE WORK GOING ON

As most are aware, we have two building going on at this time, number 14 and 15, the third , #16 has been chosen and over half of the needed funds have already been received. I expect to be looking at choose #17 soon after the first of next year. We will be flying Abner to Emanuel MBC this month to visit with the church and check the advancement of the building.

Work has slowed because of the difficulty in getting funds to the churches, the pandemic caused problems in many different areas; however things are picking up and work is getting back to normas.

The following are pictures of the progress of the buildings.

getting ready to put in the ceiling in project #14.
This is the roof at Emanuel MBC, #15, they had some problems getting funds, they now have them, metal has been purchased and they are ready to put metal on the roof.